Project

Waitawheta Track Upgrade

  • Location
    Waitawheta track, Kaimai ranges, NZ
  • Client
    Department of Conservation
  • Architect
    Frame Group
  • Structural Engineer
    Tadeas Mejdr
  • Date
    November 2013

Steep, no problem.

Our challenge
To construct 3 bridges in an isolated and challenging location. The terrain was steep and rocky, requiring gear and materials to be airlifted in.

Our solution
We constructed two suspension bridges plus a small pole bridge. Despite the challenges, these were finished on time, to a high standard.

Products Used
01

Pine timber planks and poles

02

Galvanised steel hardware

03

Galvanised wire rope

Dave Grimmer

Role

Business

“Edifice stood up to the challenging terrain and produced the goods on time within the contract price.”

More Projects

Explore your next project with Edifice

Contact

Stay up to date with Edifice

NEWSLETTER SIGN UP