Hokitika Gorge Suspension Bridge

  • Location
    Hokitika, NZ
  • Client
    Department of Conservation
  • Architect
    Jason Davidson - DOC
  • Structural Engineer
    Jason Davidson - DOC
  • Date
    June-August 2020

Wet & Wild

Our Challenge
The Hokitika Gorge Walkway is a popular trail, attracting thousands of tourists per year, Edifice were contracted to construct the 90m suspension bridge across the gorge as part of the new walkway, making the trail 2km instead of only 600m. The bridge was in a challenging location, with all gear needing to be helicoptered in to site. This location has the highest rainfall in the country, making the time frames a challenge, just as well our team is always prepared.

Our Solution
The Edifice team well and truly delivered on this project, despite the COVID19 lock down occurring in the middle of the project and many other challenges throughout. There was extensive work needed for the foundations and extra rock anchors were needed. Diverse weather patterns and high visitor numbers also meant great planning was needed. Overall, the bridge came together well. it was delivered within expected time frames and the result is stunning.

Products Used
01

Steel Connections

02

Treated Timber

03

Cables