Our challenge
A bridge that had a tree fall on it had to be rebuilt to a new design inside 6 weeks. DOC commissioned Edifice as the only contractor suitable for the job - a 50m suspension bridge in Fiordland.
Our Solution
After receiving the plans pricing was delivered within a week. This left us only 5 weeks to source the materials, prefabricate and install - suffice it to say, very happy client.