Project

Opotiki Suspension Bridge

  • Location
    Opotiki, NZ
  • Client
    Opotiki District Council
  • Architect
    Frame Group
  • Structural Engineer
    Roland Kennedy, Trevor Butler
  • Date
    February 2012

Coastal masterpiece.

Our challenge
Build an 80m suspension bridge over the Wairoa River to connect with the Motu Trail. The location was a challenge in itself, as all components needed to stand up to the harsh coastal environment.

Our Solution
Sourcing, fabricating and constructing the bridge using high-quality stainless steel components - including ss main wires. The Edifice team delivered a high level of craftsmanship on budget, on time.

Products Used
01

Galvanised steel

02

Glulam beams

03

Stainless fixings

04

Stainless wire rope

05

Pine timber

More Projects

Explore your next project with Edifice

Contact

Stay up to date with Edifice

NEWSLETTER SIGN UP