Our challenge
Build an 80m suspension bridge over the Wairoa River to connect with the Motu Trail. The location was a challenge in itself, as all components needed to stand up to the harsh coastal environment.
Our Solution
Sourcing, fabricating and constructing the bridge using high-quality stainless steel components - including ss main wires. The Edifice team delivered a high level of craftsmanship on budget, on time.