Around the Mountain Suspension Bridges

  • Location
    Fairlight to Five Rivers, Southland, NZ
  • Client
    Southland District Council
  • Architect
    Frame Group
  • Structural Engineer
    Trevor Butler, Tadeas Mejdr
  • Date
    May - September 2014

5 bridges, 5 months.

Our challenge
Build and install 5 suspension bridges ranging from 40 to 92 m, in the middle of winter - in only 5 months!

Our Solution
With 4 snowfalls during the build, and the coldest day hitting -6ÂșC, we successfully erected all 5 bridges inside the tight timeframe. Against the elements, our craftsmanship was upheld and delivered to our usual high standard.

Products Used
01

Glulam beams

02

Timber poles

03

Galvanised steel components and fixings

04

Galvanised wire rope