Work Description:
|
Edifice constructed 2x 42m span swing bridges in very steep terrain, with some parts above the main trunk line. All gear & material had to be flown in as there was foot access only. A lack of sound rock required heavier gear and extensive drilling for deeper rock anchors. All foundations were dug by hand.
|